April 11, 2022

Beginning Monday, April 11, 2022, the hospital will begin remodeling of the men and women’s restrooms located on the Main Lobby.  This project includes extensive electrical work, new electrical fixtures, updated counter tops and partitions, new floors and wall tiles. The project is expected is to complete in approximately four (4) weeks. During construction, patients will be directed to use the rooms by the auditorium on the ground, and the first floor restroom by the Cardiac Rehabilitation Entrance, just off the back North Pavilion elevators.

Following completion of the Main Lobby restrooms, we will begin work in the Harries Pavilion restrooms, and the gender-neutral single-stall restrooms by the Auditorium.

November 05, 2020

As part of our ongoing campus improvements, the circle driveway at the main lobby will be paved this evening. This requires the circle to be shut down from mid-day today through tomorrow morning. While there will be a minor, temporary inconvenience, the benefits will be worth it!

The front circle will be closed as of 12:30 p.m. Visitors and patients arriving after that time will need to either self-park or use the Harries Pavilion valet. (Those leaving the hospital will be able to retrieve their car from the main lobby valet until 3:00 p.m.)

March 17, 2020

Ambulatory care patients must enter and exit through the Harries Pavilion Entrance, located on Highland Avenue.  Exceptions made for Radiation Oncology and those needing Emergency Care.

March 14, 2020

We are using tents as auxiliary locations on an as-needed basis. Our ER triage nurses will be directing patients to these locations. These are not testing or sample collection sites. 

Anyone experiencing mild symptoms should remain home until symptoms are clear for 72 hours.  Only those experiencing severe symptoms, like severe respiratory symptoms and a high fever, should come to the emergency department.

The situation surrounding COVID-19 (novel coronavirus) continues to evolve and changes occur rapidly. As a result, Mountainside Medical Center has restricted visitation as of Friday, March 13, 2020. This visitation restriction is being done for the safety of our patients and team members.

Visitation exceptions will be made in certain situations, including hospice care, ambulatory care and same day surgery (one visitor), Maternity/Labor and Delivery (one visitor), and special circumstances determined on a case-by-case basis.

Week of Marh 9, 2020

We remain prepared and have been monitoring the outbreak, nationally and internationally. Our expert clinicians regularly care for patients with severe respiratory illnesses and other infectious diseases such as flu and COVID-19. They are well-trained and use standard measures provided by the Centers for Disease Control and Prevention (CDC). Patients are cared for in isolated areas by dedicated staff who do not care for other patients. 
 
Due to privacy laws, we cannot discuss specific patient information. If there were a public health concern, the local health department would disseminate information to the public. We remain committed to meeting our community’s needs for care while keeping our patients, providers, staff and visitors safe.
 

Week of March 9, 2020

In support of community health and to prevent the possible spread of upper respiratory illness, Mountainside Medical Center is postponing upcoming public events and meetings. This decision was made in accordance with guidance set forth by the Centers for Disease Control and Prevention (CDC) to at-risk populations to avoid mass gatherings.

Additionally, Mountainside Medical Center will be unable to accommodate community use of our meeting and conference spaces until further notice. This decision was made in accordance with guidance set forth by the Centers for Disease Control and Prevention (CDC) that at-risk populations avoid mass gatherings.

Mountainside Medical Center remains committed to meeting our community’s healthcare needs while keeping our patients, providers, staff and visitors safe.

We apologize for any inconvenience this may cause, and remind everyone that the most effective way to prevent the spread of any communicable disease is to avoid contact with those who are sick, and to stay home if you are sick. Cover your mouth and nose when you cough or sneeze, wash your hands often with soap and water for at least 20 seconds, and keep your hands away from your face if possible.

We will provide ongoing updates and thank you for your understanding.

Week of February 24, 2020

Mountainside Medical Group Offices are relocating to the Medical Office Building. Offices include: Internal Medicine, Pulmonology, Gastroenterology, and Endocrinology. For a full listing of physicians, please visit www.mountainsidedocs.com.

Week of January 9, 2020

At 2:30 p.m. on Thursday, January 9, Mountainside Medical Center is hosting the Ribbon Cutting Ceremony for the Medical Office Building. Neighbors are welcome to attend.

Week of September 23, 2019

Mountainside Medical Center will be conducting an emergency preparedness exercise, with our community partners, on Monday, September 23, 2019 from approximately 1:30 – 6:00 p.m. These exercises allow us to be prepared to best serve our community in the event of any disaster or emergency situation.

Week of September 16, 2019

On Friday, September 20 at 7:00 p.m., Mountainside Medical Center will be closing levels 4, 5, and 6 of our parking garage for approximately 2 months. In order to accommodate patients and visitors, alternate parking has been made for employees. Visitors and patients are welcome to parking in the surface lot located to the right of George Street, as well as levels 1, 2, and 3 in the parking deck. However, we strongly encourage patients to utilize the complimentary valet services available at the main lobby and Harries Pavilion entrances.

We thank you for your patience as we continue to make campus improvements.

Week of September 2, 2019

As enhancements to our campus progress, we are pleased to offer improved access to our parking garage. Effective Tuesday, September 3, 2019, upgraded ticket stations, gates and pay kiosks will be operational.  
 
The entrance and exits to the parking garage will remain in the same locations. To gain access to the garage, simply take a ticket from the ticket station at the entrance and the gate will lift allowing you entry.  Bring the ticket with you, and when you are leaving please pay at the kiosk in the main lobby entrance or on the ground floor of the garage, near the elevator. While pricing for visitor parking has not changed, you may now pay for garage parking with cash or credit card. Patients who choose to park in the garage will still have their ticket validated, however, we encourage all of our patients to use the complimentary valet services available at the main lobby and Harries Pavilion entrances. 
 
For more information about parking rates and visiting our campus please visit www.Mountainsidehosp.com/patients-visitors/parking.

Week of July 29, 2

Surface parking lot renovations are in their final stages and expected to complete within the next two weeks.  Renovations to ensure the safety of the garage for many years to come has begun and will require the closure of the garage in several stages.  The initial stage will include closure of approximately 60 spaces on the 4th, 5th and 6th floors.

We thank you for your understanding while we continue to make campus improvements.

Week of July 22, 2019

Preparations for the base of the new traffic lights on the corner of Bay Ave and Claremont Ave have begun.  Light installation will be coordinated with PSE&G.

Week of January 21, 2019

Garage repairs will begin on Monday, January 21st. Repairs will begin with the replacement of the south stairwell (closest to the Harries Pavilion), requiring us to close access to this stairwell at every level.  This phase of repair is expected to complete in four weeks.

Week of August 27, 2018

This week, demolition of the 9 hospital owned properties located on Walnut Crescent, George Street and Claremont Avenue is expected to complete.

A reminder to our neighbors: In an effort to reduce waste, the existing masonry will be crushed and recycled to build the foundation of the new medical office building. Please expect demolition noise during normal business hours (7 a.m. - 4 p.m., Monday through Saturday).

Week of July 9, 2018

On Tuesday, July 10th at 11 p.m. Mountainside Medical Center will be breaking ground on the anticipated medical office building.  In attendance will be Jon F. Hanson, Norman A. Feinstein, and Donald J. Engels from The Hampshire Companies and Jeff Sica of Circle Squared Alternative Investments, local and hospital officials, John Fromhold, FACHE, CEO of Mountainside Medical Center, Robert C. Garrett, Co-CEO of Hackensack Meridian, John Lloyd, Co-CEO of Hackensack Meridian, David Vandewater, CEO of Ardent Health Services, Frank Fekete, Chairman of the Hackensack Meridian Mountainside Medical Center Joint Venture Board, Tim O’Brien, COO of Mountainside Medical Center, Glen Ridge Mayor Stuart K. Patrick, and Montclair Mayor Robert D. Jackson.

This week, we will also begin demolition of the houses located on the Walnut Crescent/George Street lot.  Demolition is expected to take 4 days, with little to no interuption in traffic flow.

Week of May 21, 2018

On Thursday, May 24th to Friday, May 25th, the ambulance drop off zone in the front main circle on Bay Ave will be closed in order to complete the next phase of the PSE&G Emergy conservation project. A crane lift will occupy that space during this time.  The circle will remain be open and in operation for patient drop off, pick up, and valet parking.

Week of April 30, 2018

From Wednesday, May 2nd until Friday, May 25th, Mountainside will be going through the current phase of our PSE&G Energy Conservation Project.  This inclused caulking the windows of the North Pavilion (located on 1 Bay Avenue).  Cranes will be positioned at the following locations on varying days until completion:

  • Radiation Oncology Circle; May 2-11
  • Vehicular exit of main entrance circle; May 2-18
  • Vehicular entrance of main entrance circle; May 9-25
  • Bottom of Emergency Department ramp; May 9-18

Work will take place during regular business hours.  Vehicles will still be able to access the main entrance circle, and no interruption to our ambulance services are expected. The cranes will be removed during off hours. 

Week of April 23, 2018

Abatement work at the former School of Nursing and the hospital owned homes continues.  
Reminder:  A Joint Planning Board Meeting with Monclair and Glen Ridge will be held this evening at 7:30 p.m. at the Montclair Fire Department, 1 Pine Street Montclair.

Week of April 9, 2018

Fencing around the 9 hospital owned homes adjacent to the open lot across from the Emergency Department and School of Nursing parking lot the will be installed on Wednesday, April 11th in preperation for abatement work on in these buildings.  Abatement work will begin next week, with demolition to follow after completion. This work will take place during normal business hours.

March 26, 2018

Reminder: A Joint Planning Board Meeting with Monclair and Glen Ridge will be held this evening at 7:30 p.m. at the Montclair Fire Department, 1 Pine Street Montclair.

Week of March 5, 2018

On Thursday, March 8th, representatives Mountainside Medical Center and the Montclair Development Review Committee met to discuss plans for the Medical Office Building prior to the application's formal joint planning board meeting with Montclair and Glen Ridge on March 26th, at 7:30 p.m. to be held at the Montclair Fire Department, 1 Pine Street in Montclair.  Renderings for the new MOB site and new valet parking lot were presented.  Read more about the meeting here.

November 2017

We are excited to report that the Glen Ridge and Montclair planning boards have approved the Mountainside Medical Center and Hampshire Companies co-redeveloper application to build a 44,000 square feet class “A” medical office building on the old school of nursing property.  The 3 story medical office building will accommodate over 60 providers of varying specialties, ensuring that you have more options and more access to premier care for you and your family.  Along with the medical office building will a new parking, improved traffic ways, and upgrades to landscape - including a green space.  What happens next? The unoccupied, hospital owned properties along Walnut Crescent, Claremont Avenue and George Street will be leveled to create the new parking lot. Timing and details are still to be determined.  We encourage you to continue visiting this site for additional details and upcoming communications. 

Week of September 18, 2017

This week, Mountainside Medical Center will begin some necessary maintenance of our parking garage, which will require us to vacate 2 floors.  These improvements will take approximately 4 weeks, and is not expected to cause any disruption in traffic patterns.  During this time, the township of Montclair has granted us permission to use the Walnut Crescent/George Street lot as a temporary parkig location at peak hospital hours of operation.  To accomplish this, a portion of the chain linked fence will be removed and our valet team will be providing parking services for our employees.
 

Week of August 13, 2017

Verizon will be working on the hospital property on August 18th, starting at approximately 9:30 am and remaining here for 3-4 hours. Accompanied by the Montclair Police Department, they will be doing line work in the parking lot across from Outpatient parking (lot to the right of the parking deck.) 
 
Please be advised that several parking spots will be blocked off by the Mountainside Medical Center Security Department. To avoid ticketing, towing or damage, please park in the parking deck located on Walnut Crescent.
 

Weeks of April 10th and 17th, 2017

From April 13th through April 17th, the public EXIT LANE to the parking garage will be closed to repair damaged sections of the driveway.  Visitors may exit through the employee exit, located on the oposite end of the parking garage. A parking lot attendant will be stationed for assistance.

Weeks of February 6 and 13,  2017

On Friday February 2 and Monday, February 13, Verizon Wireless will be changing the hospital's antennas to enhance wireless connections. The corner of Bay Avenue and Highland Avenue will be temporarily closed to traffic from 9am-5pm. 

Week of June 13, 2016

A site survey is being conducted.  Survey areas include the surface parking lots, the open field across from the Emergency Department and other areas of the hospital campus.  Site surveys provide information for design, project estimates and a variety of other tasks associated with the Medical Office Building project.

Week of January 11, 2016

During the week of January 11th (including the weekend) the Montclair Fire Department will be on site at the vacant School of Nursing Building to conduct training drills for firefighters and fire officers.

Week of December 14, 2015

On Friday, December 18th from 8 am to 4 pm you may observe large plumes of steam from the hospital’s new steam silencer. HackensackUMC Mountainside recently invested $18,000 to install a boiler steam silencer to lessen the amount of ambient sound from normal, day to day boiler operations. On Friday, December 18 the New Jersey Department of Environmental Protection (DEP) will be on site to conduct an emission test of our new energy efficient boilers at 100% capacity. The testing will be conducted in accordance with DEP protocol and will produce significant amounts of environmentally safe steam. Thank you for your patience and cooperation while we conduct this important testing to ensure that the system is working properly.

Week of November 9 and November 16, 2015

A traffic and parking analysis, sponsored by the Township of Montclair and the Borough of Glen Ridge, will be conducted during the weeks of November 9th and November 16th. During this time, several methods of traffic analysis will be used, including: automatic traffic recorders, cameras and visual/field observation

Week of October 19, 2015

On Monday, October 19 from approximately 8 am to 5 pm a crane will be located on Highland Avenue near the hospital’s Harries Pavilion entrance. HackensackUMC Mountainside recently acquired a new fully loaded, Siemens MAGNETOM Aera 1.5 Tesla MRI machine; the crane is necessary for the de-installation of the existing machine. Once installed, the MRI equipment upgrade will provide our community with access to the most up-to-date MRI technology.

Week of September 14, 2015

On September 16-17, representatives from Atlantic Traffic & Design Engineers will be onsite to conduct fieldwork related to a Parking Supply and Utilization Study.  This study is necessary for two reasons:  1) to provide information to Montclair and Glen Ridge related to their re-zoning process currently underway for the new Medical Office Building; 2) to determine the number parking spaces needed for the new Medical Office Building.  Representatives from Atlantic will be on-and-around the campus from 6:00 am – 8:00 pm both days.  

Week of August 30, 2015

On Wednesday, September 3 from approximately 7 am to 3 pm a crane will be located on Highland Avenue near the hospital’s Harries Pavilion entrance. HackensackUMC Mountainside recently acquired a new fully loaded, Siemens MAGNETOM Aera 1.5 Tesla MRI machine; the crane is necessary for the de-installation of the existing machine. Once installed, the MRI equipment upgrade will provide our community with access to the most up-to-date MRI technology.  

Week of July 6, 2015

Later in the week of July 6th, representatives from an engineering firm will be on site to survey proposed parking locations for: Dialysis Ambulance parking at 1 Bay Avenue, and additional Emergency Department parking in the vicinity of Walnut Crescent.

April/May 2015

Beginning on or about April 28th and continuing for approximately 4 weeks, contractors will work on underground utility lines for HackensackUMC Mountainside in the areas of Ridgewood Road, Forest Avenue and Sherman Avenue. This project will help ensure reliable electric power for the hospital, especially during extreme weather events. The utility work may involve lane closures and traffic re-routing as crews work in the area. Local law enforcement will be assigned to the area to assist with traffic.

April 2015

Routine antenna upgrades are planned for April, weather permitting. Work is scheduled for 8 am – 4 pm and may require a man-lift. A Glen Ridge police officer will be assigned to the area if a man-lift is needed.

Week of March 23, 2015

This week, an environmental survey will be conducted on hospital owned properties on Walnut Crescent and across from Emergency Department. The survey will provide a general overview of environmental matters related to development of the site.

Week of March 16, 2015

On Sunday, March 22nd, land surveyors will be on site at the School of Nursing to assess tree locations and other physical features.

Week of January 12, 2015

This week on campus, engineers will be drilling into the ground to pull out core samples to get an understanding of the rocks and types of soil that exist beneath our feet. The engineers and their equipment will be on campus on Friday, January 16th around the perimeter of the current buildings, on the lawn area and in the parking lot. The information provided from the samples will help us to prepare plans for the foundation of the new medical office building.

Week of January 5, 2015

This month, our School of Nursing moved to their new home on the campus of Montclair State University. As we were cleaning out the old building, we found a treasure trove of memorabilia in the basement, representing many different eras in the history of the School of Nursing. In the next few weeks, we will be taking inventory of the items with the expert help of both the Glen Ridge and Montclair Historical Societies. We are grateful for their assistance in helping us preserve these artifacts.

Week of December 15, 2014

It’s moving day! The HackensackUMC Mountainside School of Nursing and Partners for Health Foundation are relocating It’s moving day! The HackensackUMC Mountainside School of Nursing and Partners for Health Foundation are relocating to new their new homes. Montclair State University welcomes the School of Nursing and the Partners for Health Foundation is unpacking at 54 Plymouth Street, Montclair. Those big green containers in front of the building are here temporarily to help with the office clean out.

Week of December 9, 2014

A site survey is being conducted. The site survey will provide information for design, project estimates and a variety of other tasks associated with the Medical Office Building project.

A traffic survey is also being conducted. The traffic survey will quantify current traffic conditions and provide information related to transportation matters in connection with the Medical Office Building project.